Electrical SME - Data Center Construction
jll · Gandhinagar
Job description
About the role
JLL is hiring an Electrical Subject Matter Expert for data center construction in Gandhinagar. You will provide expert technical leadership and oversight for electrical systems design, installation and commissioning on mission-critical data center projects, ensuring reliability, redundancy and compliance with industry standards while working with multidisciplinary teams.
Key responsibilities
- Review and approve electrical design documents, load calculations, single-line diagrams and specifications for medium/high-voltage distribution, UPS systems, generators, PDUs and backup power infrastructure.
- Ensure electrical systems meet data center tier requirements (Uptime Institute), TIA-942 standards, NEC/NFPA codes and client-specific uptime and redundancy criteria (N, N+1, 2N).
- Evaluate electrical submittals, equipment specifications and vendor proposals for switchgear, transformers, ATS, battery systems and busway distributions.
- Oversee installation quality, testing protocols and commissioning, including load bank testing, IST and parallel generator operations.
- Work with MEP design teams, contractors and commissioning agents to resolve design conflicts, value engineering and field coordination issues.
- Lead technical risk assessments and failure mode analysis, and guide electrical safety, arc flash studies, short circuit analysis and protective device coordination.
Required profile
- Bachelor's degree in Electrical Engineering or a related field, or equivalent education and experience.
- Minimum 10-15 years of electrical engineering experience, with at least 5 years in data center or mission-critical facility design, construction and commissioning.
- Preferred: Professional Engineering (PE) license or equivalent certification.
- Preferred: strong communication and leadership skills, with the ability to mentor technical teams and interface with clients.
Required skills
- Deep knowledge of UPS, generators, PDUs, switchgear, transformers and backup power configurations.
- Proficiency in AutoCAD, Revit MEP, SKM PowerTools, ETAP or similar.
- Knowledge of Uptime Institute Tier Standards, TIA-942, NEC, NFPA 70E and IEEE standards.
- Experience with commissioning protocols, IST and facility handover.
Questions fréquentes
Why are you reporting this job?
Explore further
Salaries, guides and searches in India.
Salaries by job title
Apply in 30 seconds
Enter your email to apply. An account will be created automatically.
By continuing, you accept our terms of use.
Already have an account? Login
A question about this job?
Ask it here: you will get the full job summary by e-mail, right away.
Published 8 hours ago
Expires 1 month from now
6 views · 0 interested
Boost your chances
Upload your CV — we will match you with relevant openings.
Analyzing your CV...
jll
Gandhinagar